PITCH PROJECT

Hereby San Giljan ASC would like to inform the general public that all EIA reports pertinent to the Club’s application for the pool project have been duly submitted to ERA.

These studies, which were commissioned from field experts, included Wave Penetration Studies, Infrastructural studies, Public access analysis, Geology studies, Visual Amenity studies, Marine Ecology and Archaeology studies.

The next phase of the project includes a public consultation.

The President and Committee of the Club would like to thank the Minister for Education and Sports Hon Dr Clifton Grima and Sports Malta for their support.

PA 03927/19 (EA 00009/20)
Top